Case Studies
The Finn Joint was installed in the main turning bay for semi-trailers at the Gourmet Gardens processing plant in Palmwoods. The sample was installed on 7th August 2009, and is holding up extremely well. It is exposed to...
The Finn Joint was installed in the main driveway in a Bitumen Plant in Caloundra. There was a severe time restriction on the job necessitating a single pour. The Finn Joint was used to great effectiveness and allowed the...
Finn Joint Fitted to key former and timber formwork in Flaxton, for a private residence.
A continuous pour of a long driveway in flaxton was completed with the use of the Finn Joint, fitted to key former and timber formwork.
The Finn Joint was used to create a checkerboard pattern at St Joseph's school in Nambour. The Finn Joint reduced the need for a concrete pump from 4 days to 2 days during construction, providing significant cost savings for...
Prev
Next
1
6 Images Displayed Per Page
15 Images Displayed Per Page








